The Como Engineers office will be closed from Thursday 22 December and re opening Wednesday 4 January – we wish all our clients and suppliers (and their families) a safe and happy break over the Christmas / New Year period

News List

Binduli North Gold Project Pressure Zadra Elution Plant

Como Engineers were engaged to supply a 5T Modular PLC Automated Pressure Zadra Elution System with a 250kg/h LPG fired kiln supplied by our...

Read More

Singida Gold Project Pressure Zadra Elution Plant

The Shanta Mining Company Limited operates the Singida Gold Project located in the Lupa Goldfields of the Songwe District of Central Tanzania. Singida is Shanta’s second operating mine in Tanzania, combined with the existing operation (New Luika) will make Shanta a +100,000 oz per annum gold producer. Como Engineers provided the complete 2 Tonne Modular […]

Read More

Awak Mas Gold Project CIL/CIP Plant Detailed Design

PT Masmindo DWI Area (MDA) are developing the Awak Mas Gold Mine located in South Sulawesi province, Indonesia. The Awak Mas Gold Project is...

Read More

Boorara Gold Project

Como Engineers were engaged to undertake a Pre Feasibility (PFS) and Definitive Feasibility Study (DFS) for the process design of a 1.5 Mtpa gold process plant and associated infrastructure. The feasibility study scope of work included the following: Undertake Gap Analysis on metallurgical testwork, looking at different ore types and lithologies; Generate a Design Criteria […]

Read More

Söğüt Gold Project CIL/CIP Plant Detailed Design

Gubretas Maden are developing the Söğüt Gold Mine located in central Turkey. Mining operations will be both Open Cut and Underground and the...

Read More

Loading ...