Boorara Gold Project

Como Engineers > Projects > Boorara Gold Project
2021
Eastern Goldfields, WA
Client:

Horizon Minerals Limited

Go back to projects Printable Version

Como Engineers were engaged to undertake a Pre Feasibility (PFS) and Definitive Feasibility Study (DFS) for the process design of a 1.5 Mtpa gold process plant and associated infrastructure.

The feasibility study scope of work included the following:

  • Undertake Gap Analysis on metallurgical testwork, looking at different ore types and lithologies;
  • Generate a Design Criteria for the treatment plant showing the different ore types;
  • With inputs from mining for non-process flows generate an overall water balance for the site;
  • Generate the equipment list including sizing, selection, and face plate power for the treatment plant;
  • Generate the plant infrastructure requirements and costs
  • Develop plant layout drawing and incorporate other areas to enable overall all site layout to be compiled i.e., mine, haul roads, tailings dam;
  • Generate general arrangement drawings for the processing plant to be used as the basis of the plant estimate;
  • Generate capital cost estimate for the processing facility to an accuracy of +/-15% with multiple sourced pricing and detailed MTOs

 

Como Engineers were engaged to undertake a Pre Feasibility (PFS) and Definitive Feasibility Study (DFS) for the process design of a 1.5 Mtpa gold process plant and associated infrastructure.

The feasibility study scope of work included the following:

  • Undertake Gap Analysis on metallurgical testwork, looking at different ore types and lithologies;
  • Generate a Design Criteria for the treatment plant showing the different ore types;
  • With inputs from mining for non-process flows generate an overall water balance for the site;
  • Generate the equipment list including sizing, selection, and face plate power for the treatment plant;
  • Generate the plant infrastructure requirements and costs
  • Develop plant layout drawing and incorporate other areas to enable overall all site layout to be compiled i.e., mine, haul roads, tailings dam;
  • Generate general arrangement drawings for the processing plant to be used as the basis of the plant estimate;
  • Generate capital cost estimate for the processing facility to an accuracy of +/-15% with multiple sourced pricing and detailed MTOs.

Como Engineers were engaged to undertake a Pre Feasibility (PFS) and Definitive Feasibility Study (DFS) for the process design of a 1.5 Mtpa gold process plant and associated infrastructure.

Recent News & Projects

Binduli North Gold Project Pressure Zadra Elution Plant

Binduli North Gold Project - Western Australia

Singida Gold Project Pressure Zadra Elution Plant

Lupa Goldfields of the Songwe District of Central Tanzania
Loading ...