The Como Engineers office will be closed from Thursday 22 December and re opening Wednesday 4 January – we wish all our clients and suppliers (and their families) a safe and happy break over the Christmas / New Year period
Como Engineers > News > Project News > Como Engineers – Every Little Bit Helps

The gold elution plants that we design, manufacture and deliver can be powered by gas or diesel fuel, however we are finding more demand for our electrically powered designs.

All lighting in our workshop has been upgraded to low energy bulbs.  Scrap metal from our plants (copper, steel, stainless steel) is recycled as well as soft drink cans and bottles.

Plants are transported to site utilising sea containers.  We utilize every inch of the sea containers to deliver these plants to site. Compared with a traditional onsite stick-build plant  that requires multiple truck movements, our approach means fewer trucks, lower diesel use, and a smaller transport footprint.

Added to this, our installation method reduces time and resources on site. We only need a small crew for a few weeks to install the plant, whereas a traditional build requires a larger team on site for multiple months. This translates to both lower costs and reduced environmental impact from moving and accommodating crews.

 

Loading ...