Equipment Supply
Amec Foster Wheeler (Wood PLC) / Civmec Joint Venture (ACJV)
Project Overview
Como Engineers provided electrowinning and carbon regeneration equipment for the Gruyere Gold Project Joint Venture. This included a 1,500 kg/h Carbon Regeneration Kiln made by Custom Furnaces, which Como Engineers represents in Australia; at the time of installation it was the largest fuel-fired horizontal rotary kiln Custom Furnaces had made, and kilns as large as 2,000 kg/h have since been made. Como Engineers also supplied 6 off 800x800x12 electrowinning cells, fume extraction systems and other goldroom equipment. These specialist equipment items were designed by Como Engineers specifically for the gold industry and are fabricated at its North Fremantle premises.