Scope

Equipment Supply

Client

Amec Foster Wheeler (Wood PLC) / Civmec Joint Venture (ACJV)

Project Overview

Como Engineers provided electrowinning and carbon regeneration equipment for the Gruyere Gold Project Joint Venture. This included a 1,500 kg/h Carbon Regeneration Kiln made by Custom Furnaces, which Como Engineers represents in Australia; at the time of installation it was the largest fuel-fired horizontal rotary kiln Custom Furnaces had made, and kilns as large as 2,000 kg/h have since been made. Como Engineers also supplied 6 off 800x800x12 electrowinning cells, fume extraction systems and other goldroom equipment. These specialist equipment items were designed by Como Engineers specifically for the gold industry and are fabricated at its North Fremantle premises.

Related case studies

  • Gruyere Gold Project – Carbon Regeneration Kiln and Electrowinning Equipment Supply

    Amec Foster Wheeler (Wood PLC) / Civmec Joint Venture (ACJV)

    Australia

  • Jaguar Copper/Zinc Plant Restart and HMS Plant

    Jabiru Metals

    Australia

Ready To Start A Project?

Contact us to discuss how our engineering solutions can support your project, from concept to completion. The Como Engineers team is here to help.