Equipment Supply,Modular Elution (PZ)
Managem Group
5t
Project Overview
Como Engineers delivered a 5 tonne PZ plant to support Managem Group’s operation at the Boto gold project, located in the eastern part of Senegal, close to the borders of Mali and Guinea and 88 km from the city of Kédougou. The ore is processed in a CIP plant at an annual capacity of 2.75 Mtpa, with average production expected to be around 170,000 ounces of gold per year during the first three years and around 128,000 ounces per year over the entire life of mine (LOM). Como Engineers has been working with Managem for over a decade, and this installation follows other projects completed by Como Engineers for Managem in Sudan (Manub – Block 15): Stage I, a 2 Tonne PZ Plant; Stage II, a 4 Tonne PZ Plant; and Stage III, Expansion Engineering Support.