Equipment Supply,Installation,Modular Elution (PZ),Upgrades
Victory Minerals
2t
Project Overview
Como Engineers was engaged by Victory Minerals to expand the processing capability at the Ballarat Gold Mine in Central Victoria. The expansion comprised three distinct scopes: an additional 1 MW ball mill, a 1 Mtpa CIL circuit, and a 2T Pressure Zadra elution circuit and regeneration kiln, together with tailings reclaim infrastructure.
Ball mill: An additional 1 MW ball mill was installed into the existing grinding circuit to deliver a more consistent grind size, improving recovery in the flotation circuit and enabling tailings reclaim for reprocessing, allowing the plant to operate at a higher utilisation level. Tailings reclaim infrastructure was installed to enable reprocessing.
CIL circuit: A 1 Mtpa CIL circuit and associated infrastructure were installed.
Pressure Zadra elution circuit: The scope included a 2T Pressure Zadra elution circuit and regeneration kiln.
Ready To Start A Project?
Contact us to discuss how our engineering solutions can support your project, from concept to completion. The Como Engineers team is here to help.