Scope

Design,Equipment Supply,Modular Elution (PZ)

Client

Nordgold

Processing Capacity

10t

Project Overview

Como Engineers was engaged by Nordgold for the detailed engineering design and construction of the elution, carbon regeneration, goldroom and carbon recovery systems for the Gross Gold project. Gross is located in Siberia, Russia, in the Yakutiya region, where temperatures can fall to -55°C. Como Engineers was responsible for the supply of the proprietary designed modular pre-fabricated and pre-commissioned plant with 10 tonne capacity elution and acid wash columns, its ESF series stainless steel range of electrowinning cells, quench tank pressure vessels, a 500kg/hr Carbon regeneration kiln and all required ancillary accessories. Subsequently, Nordgold purchased additional electrowinning cells and, through continuous operation, has increased the capacity of the plant to process up to 20 tonne per day. Nordgold had previously purchased individual gold room equipment from Como Engineers for the Lefa Gold Plant in Guinea; this is the first complete modular plant Nordgold has purchased.

Related case studies

  • Greenstone Gold Mine – 12t Modular Pressure Zadra Elution Plant

    Equinox Gold

    Canada

  • Gruyere Gold Project – Carbon Regeneration Kiln and Electrowinning Equipment Supply

    Amec Foster Wheeler (Wood PLC) / Civmec Joint Venture (ACJV)

    Australia

Ready To Start A Project?

Contact us to discuss how our engineering solutions can support your project, from concept to completion. The Como Engineers team is here to help.