Scope

Installation,Modular Elution (PZ)

Client

Shanta Mining Company Limited

Processing Capacity

2t

Project Overview

Como Engineers provided the complete 2 Tonne Modular Pressure Zadra Gold Elution Plant for Shanta Mining Company Limited’s Singida Gold Project, located in the Ikungi District of the Singida Region of Central Tanzania. Singida is Shanta’s second operating mine in Tanzania and, combined with the existing New Luika operation, makes Shanta a +100,000 oz per annum gold producer. The plant was fully assembled and tested before being broken down for transport, comprising only seven sea containers, and the regeneration kiln (supplied by Custom Furnaces) was transported directly from South Africa to Tanzania. On site, the entire elution module was manoeuvred into place with a single 12T crane. The modular nature of the Como Engineers plant makes it easier to ship, store, construct and commission on site.

Related case studies

  • Mt Chalmers Copper-Gold Project – Test-work and Pre-Feasibility Study

    QMines

    Australia

  • Lake Johnston Mill Refurbishment and Gold Recovery Plant

    Forrestania Resources

    Australia

Ready To Start A Project?

Contact us to discuss how our engineering solutions can support your project, from concept to completion. The Como Engineers team is here to help.