Design,Equipment Supply,Modular Elution (PZ)
Merdeka Copper Gold
6t
Project Overview
Como Engineers, in partnership with PT Como Engineers, delivered two separate scopes for the Pani Gold Project: the Carbon in Column (CIC) circuit, managed by the PT Como Engineers office in Jakarta, and a 6T Pressure Zadra gold elution plant, managed by the Perth office of Como Engineers.
CIC circuit: The CIC circuit includes the supply of two (2) CIC Trains, each capable of treating 500 m³/hr PLS flow, and one (1) 500 m³/hr Scavenger Plant. All carbon transfers are conducted using client-supplied available water pressure, so no additional pump sets are required; this design element, which Como Engineers uses on its CIC circuits and Modular Elution Plants, reduces carbon attrition and therefore carbon fines generation. The design incorporates modular packages to assist with streamlining the construction schedule and commissioning of the plant.
Pressure Zadra elution plant: Como Engineers supplied a 6T Pressure Zadra gold elution plant.
Ready To Start A Project?
Contact us to discuss how our engineering solutions can support your project, from concept to completion. The Como Engineers team is here to help.