Scope

Design,Modular Elution (PZ)

Client

Al Masane Al Kobra Mining Co.

Processing Capacity

2t

Project Overview

Como Engineers was engaged to supply a 2T Modular PLC Automated Pressure Zadra Elution System with an all-electric 100kg/h Kiln supplied by its long-term partner Custom Furnaces, including carbon regeneration structure, feed hopper, quench tank and ancillary equipment. The scope included the design of a concrete tilt panel gold room, with the supply of secure doors, vault door, safe and other gold room equipment. The elution plant was designed, fabricated, assembled and hot run tested in Perth prior to disassembly and packing in 6 off 40’ sea containers, 24 weeks Ex-Works. The Carbon Regeneration Kiln, modular structure, hoppers and chutes were fabricated in South Africa and shipped to site in 4 off 40’ sea containers. The system included a 400kW Direct Eluate Electric Heating system with full PLC control of all elution and electrowinning process steps, and was manufactured to Como Engineers’ latest design with improved safety and modularity, saving time during site installation.

Related case studies

  • Tujuh Bukit Gold Project – Wet Plant Design and 8 Mtpa Upgrade

    PT Bumi Suksesindo

    Indonesia

  • Peculiar Knob Iron Ore Project – Studies and Infrastructure Delivery

    WPG Resources / Arrium

    Australia

Ready To Start A Project?

Contact us to discuss how our engineering solutions can support your project, from concept to completion. The Como Engineers team is here to help.