Scope

Equipment Supply,Installation,Modular Elution (PZ),Upgrades

Client

Victory Minerals

Processing Capacity

2t

Project Overview

Como Engineers was engaged by Victory Minerals to expand the processing capability at the Ballarat Gold Mine in Central Victoria. The expansion comprised three distinct scopes: an additional 1 MW ball mill, a 1 Mtpa CIL circuit, and a 2T Pressure Zadra elution circuit and regeneration kiln, together with tailings reclaim infrastructure.

Ball mill: An additional 1 MW ball mill was installed into the existing grinding circuit to deliver a more consistent grind size, improving recovery in the flotation circuit and enabling tailings reclaim for reprocessing, allowing the plant to operate at a higher utilisation level. Tailings reclaim infrastructure was installed to enable reprocessing.

CIL circuit: A 1 Mtpa CIL circuit and associated infrastructure were installed.

Pressure Zadra elution circuit: The scope included a 2T Pressure Zadra elution circuit and regeneration kiln.

Related case studies

  • Three Springs Talc Ore Sorting Plant Expansion

    IMERYS Australia Talc

    Australia

  • Tujuh Bukit Gold Project – Wet Plant Design and 8 Mtpa Upgrade

    PT Bumi Suksesindo

    Indonesia