Scope

Equipment Supply,Refurbishment

Client

Hanking Gold Mining Pty Ltd

Project Overview

The Marvel Loch contract undertaken by Como Engineers involved refurbishment of an existing 2.2Mtpa gold processing plant and modifications to the plant’s classification circuit. Works comprised a complete refurbishment of structures, launders, chutes, walkways, platforms, stairs, hoppers, bins and other static equipment. The three (3) mills had all drive trains stripped, refurbished and reinstalled, including hand linishing of girth gears and pinions. Conveyor sections and chutes that were too corroded to repair were replaced with new sections and chutes fabricated at the Como Engineers workshop and installed on site. Concrete repairs were conducted to most tank bases, a large number of structure footings and all three mill plinths.

Related case studies

  • Greenstone Gold Mine – 12t Modular Pressure Zadra Elution Plant

    Equinox Gold

    Canada

  • Marvel Loch Gold Processing Plant Refurbishment

    Hanking Gold Mining Pty Ltd

    Australia

Ready To Start A Project?

Contact us to discuss how our engineering solutions can support your project, from concept to completion. The Como Engineers team is here to help.