Scope

Design,Modular Elution (PZ)

Client

Norton Gold Fields

Processing Capacity

5t

Project Overview

Como Engineers was engaged to supply a 5T Modular PLC Automated Pressure Zadra Elution System with a 250kg/hr LPG fired kiln supplied by its long-term partner Custom Furnaces, including the carbon regeneration structure, feed hopper, quench tank and ancillary equipment. The scope also included the design of the modular gold room, with the supply of the smelting furnace, safe, drying oven and other gold room equipment. The elution plant was designed, fabricated, assembled and hot run tested in Perth prior to disassembly, packing and delivery by truck to site, while the Carbon Regeneration Kiln, hoppers and chutes were fabricated in South Africa and shipped to site. The elution system included a 1200kW Direct Eluate LPG fired Heating system with full PLC control of all elution and electrowinning process steps, and a closed loop cooling system, among other adaptations, was introduced to reduce the client’s water usage.

Related case studies

  • Great Australia Mine – CIL Upgrade, Gravity Circuit and 2t Modular Pressure Zadra Elution Plant

    CopperChem Pty Ltd

    Australia

  • Cuiú Cuiú Gold Project – 2t Modular Pressure Zadra Elution Plant

    Cabral Gold

    Brazil

Ready To Start A Project?

Contact us to discuss how our engineering solutions can support your project, from concept to completion. The Como Engineers team is here to help.