Scope

Modular Elution (PZ)

Client

Equinox Gold

Processing Capacity

12t

Project Overview

Como Engineers provided a modular PZ plant as a key component of Equinox Gold’s Greenstone Mine Project. Equinox Gold has completed the design, construction and commissioning of the open-pit gold mine, processing plant and ancillary facilities, and the treatment plant is designed to process an average of 27,000 tonnes per day. Winter temperatures fall below -20°C, so the process plant is located inside a building to protect it from the elements. Como Engineers worked with the client to fit the plant within their footprint and to ensure it could accommodate the processing of intermittent higher grade ore. The modular design allowed the plant to be incorporated into the Greenstone Gold Mine plant design, and the plant was pre-assembled and pre-commissioned at the Como Engineers workshops prior to delivery to site.

Related case studies

  • Three Springs Talc Ore Sorting Plant Expansion

    IMERYS Australia Talc

    Australia

  • Lake Johnston Mill Refurbishment and Gold Recovery Plant

    Forrestania Resources

    Australia

Ready To Start A Project?

Contact us to discuss how our engineering solutions can support your project, from concept to completion. The Como Engineers team is here to help.