Osborne Magnetite Project
![](http://www.comoeng.com.au/wp-content/uploads/2019/03/Osborne-Magnetite-Project-1.png)
Detailed Feasibility Study to determine optimal flowsheet, capital and operating costs for a 2Mtpa magnetite concentrator treating flotation tailings for the Osborne Flotation Plant.
Costs are to be determined to an accuracy of +/-15%
Recent News & Projects
![](http://www.comoeng.com.au/wp-content/uploads/2023/04/Image-cropped-scaled.jpg)