Osborne Magnetite Project
Detailed Feasibility Study to determine optimal flowsheet, capital and operating costs for a 2Mtpa magnetite concentrator treating flotation tailings for the Osborne Flotation Plant.
Costs are to be determined to an accuracy of +/-15%