Studies
Design and Construction
Gold Process
 

Facts Sheet Page

PDFPrintE-mail

For your interest and perusal the following technical documents are made available for download.

 
Unless otherwise flagged, these documents are in pdf format, which requires a pdf reader to view. To download use the right mouse button to click and select "save target as" from the pop up window.

 

Como Engineering Technical Documents

Article 1 : Barring furnace and calcine oven refractory replacement kits. (29kb)
Article 2: Butterfly valves and relief valves on elution columns. (18kb)
Article 3: Cost effective recovery of gold bearing carbon from fines and slimes (48kb)
Article 4: Direct elution heating (63kb)
Article 5: Electrowinning cells (114kb)
Article 6: Environmentall policy and procedures (29kb)
Article 7: Fine carbon recovery from tails screen (18kb)
Article 8: Gold recovery from used crucibles (17kb)
Article 9: Gold room and elution circuit spares and consumables (17kb)
Article 10: In pit tailings disposal (26kb)
Article 11: Modular stripping plants (97kb)
Article 12: Vertical reactivation kiln (44kb)

 

Como Engineers Quality Assurance Manual

Entire Manual: Entire Como Engineers Quality Assurance manual (510kb zip file)
Section 0: Contents page(22kb)
Section 1: Management review (146kb)
Section 2: Quality system documentation (42kb)
Section 3: Contract review (32kb)
Section 4: Design control (24kb)
Section 5: Document control (40kb)
Section 6: Purchasing (178kb)
Section 7: Purchaser supplied product (14kb)
Section 8: Product identification and traceability (25kb)
Section 9: Process control (26kb)
Section 10: Inspection and testing (68kb)
Section 11: Inspection, measuring and test equipment (18kb)
Section 12: Inspection and test status (18kb)
Section 13: Control of non-conforming product (24kb)
Section 14: Corrective action (20kb)
Section 15: Handling, storage, packaging and delivery (21kb)
Section 16: Quality records (16kb)
Section 17: Internal quality audits (29kb)
Section 18: Training (14kb)
Section 19: Servicing (14kb)
Section 20: Statistical technique (14kb)
Section 21: Procedures index (13kb)

 

Safety and Environment

Environmental Policy and Procedures (29kb)
Site Safety Handbook (231kb)

 

Miscellaneous

Article 1: Como Engineers Statement of Capabilities. (125kb)
Article 2: Local knowledge goes global (19kb)
Article 3: Short resumes of key personnel at Como Engineers (11kb)
Page from "Australian Miner" December 2002. Features the Challenger gold mine, with which Como Engineers were heavily involved. (909kb)
Gold Gazette Sep 02: More on the Challenger mine (197kb)
Gold Gazette Sep: Features Como Engineers role in Challenger mine (222kb)

 

Purchasing

Como Engineers Purchase Order Conditions and Instructions for Goods and Services: (130kb)
27 McCabe St, Mosman Park, WA 6012
Tel: +61 8 9432 0100
Fax: +61 8 9336 4900
 
This website is best viewed at 1024x768 or higher resolution with Internet Explorer 7, Firefox 3.5 or newer